Aledo Multi-Campus

design firm

VLK Architects

project type

Multi-Campus Renovation

building size

5 Campuses

delivery method

CSP

Aledo ISD

Aledo, TX; Willow Park, TX

Demonstrating Gliden’s commitment to accelerated delivery, this project upgraded security and public-facing facilities at five district campuses. The scope included the full-scale installation of modernized access control systems at every entry point to heighten campus safety. Simultaneously, our team transformed the reception areas at several campuses, delivering premium millwork, refreshed painting, and high-durability flooring. By re-engineering the logistics of this multi-site rollout, Gliden successfully executed the entire scope during a single winter break—completing the program several months ahead of the district’s projected timeline and ensuring a more secure environment for students and staff to begin the new semester.

Other projects