Special Projects

Fire Alarm System Renovation

Client
Birdville ISD—Watauga Elementary School
Project Details
  • Installation of all new fire alarm system
  • Additional infrastructure and finishes added to support the system, including electrical, conduit, fire caulking, painting and ceiling removal/replacement
Gliden's Performance
Aggressive completion schedule ensured all work was done at the beginning of summer and finished prior to staff return. Finished 12 days before contractual completion date.
A commercial icon
Commercial Headquarters Roofing Repair

Client
PepsiCo/Frito Lay
Project Details
  • Performed critical patches to roof at headquarters building as part of larger project for Brandt Companies
  • Installed pitch pans on roofs along with spud gravel and self-leveling sealer
  • Accomplished all work within quick schedule to keep the project progressing
Anchor Bases

Client
Tarrant County College Northwest
Project Details
  • Formed and poured new concrete anchor bases at below grade piping vaults
  • Poured new concrete for the new boilers
  • Project was accomplished successfully in requested timeframe
HVAC Replacement

Client
Richardson ISD - Terrace Elementary School
Project Details
  • Gliden completed all architectural scope for an HVAC renovation at Terrace Elementary School.
  • Updates included acoustical ceiling and gypsum ceiling replacements throughout the school at various repair locations.
Gliden Performance
  • Gliden worked diligently with trade partners to schedule the project within a short summer timeframe, expediting the startup process and submittals to mobilize for the summer break.
Classroom Remodel

Client
Richardson ISD - Northlake Elementary School
Project Details
  • Completed sawcutting and trenching to demolish and reconfigure plumbing for science lab
  • Completed new millwork and plumbing fixtures installation, as well as finishes updates
Gliden Performance
  • Completed on a short turnaround during the winter break
Millwork Installations

Client
Aledo ISD - Annetta Elementary School
Project Details
  • Installed a new millwork cabinet system at Annetta Elementary School
Gliden Performance
  • Completed the project over the school's spring break to prevent interruptions to school scheduling
A commercial icon
CRAH Phase I & II

Client
Confidential Client
Project Details
  • The Computer Room Air Handler (CRAH) Phase I and II project consisted of modifications to the data center CRAH floor paneling and acoustical ceilings following improvements to the room’s cooling infrastructure.
Gliden Performance
  • Requested and completed on a short timeline for an existing client
A commercial icon
Agora Canopies

Client
Confidential Client
Project Details
  • Gliden completed construction of large exterior metal canopies to provide a covered lay-down area for a longer duration construction project.
Gliden Performance
  • Requested and completed on a short timeline for an existing client
Parking Lot Modification

Client
Birdville ISD—Cheney Hills Elementary School
Project Details
  • Renovated parking lot at Cheney Hills Elementary School to better serve traffic flow
  • Added new striping, signage and security gate to update the space
Gliden's Performance
Performing project outside of school hours to prevent any disruptions to normal school activities.
A commercial icon
Cooling Tower Ladder Installation

Client
PepsiCo/Frito Lay
Project Details
  • Installed new ladder at data center cooling tower to extend to top of parapet
  • Ladder included cage, parapet return, crossover platform and Hilti anchor installation
  • Successfully executed project according to quick turnaround schedule
Concrete—CUP Renovation

Client
Tarrant County College Northwest
Project Details
  • Completed concrete work as part of a CUP renovation
  • Among other items, work included a trench infill, chiller pad extensions and epoxy coatings
  • Project was completed under short notice within the requested timeframe
C210 Renovation

Client
Richardson ISD - Richardson High School
Project Details
  • Completed updates to the RISD technical classroom and office including new LVT flooring and painting
Gliden Performance
  • This project took place on a short schedule to ensure the classroom was ready for the fall semester. The Gliden team expedited estimations and ensured materials could be procured in the necessary timeframe.
Parking Lot Pourback

Client
Southern Methodist University
Project Details
  • Completed a parking lot pourback the SMU campus church following repair of underground steam piping
Gliden Performance
  • Requested and performed on a short turnaround to ensure on-time project completion
Drainage and Concrete Installations

Client
Birdville ISD - Smithfield Elementary School
Project Details
  • Completed exterior updates to improve drainage by installing a new concrete swale and a new french drain
  • Scope included demolition, excavation, concrete work, and placement of new sod
Gliden Performance
  • Gliden Industries supported and expedited the campus's efforts to improve drainage in the midst of the rainy season. Gliden Industries completed all work outside of school hours and on a short turnaround.
A commercial icon
Acoustical Systems: Chiller Yard B Acoustical Modifications

Client
Confidential Client
Project Details
  • The Acoustical Systems project included installation of acoustical wall panels, acoustical chiller stacks, and compressor blankets with the goal of improving noise from the chiller yard compressors.
    Gliden Performance
    • Requested and completed on a short timeline for an existing client
    Classroom Modification

    Client
    Birdville ISD—Haltom High School
    Project Details
    • Completed ceiling modification to improve the classroom acoustics
    • Completed a MEP retrofit to accommodate the new room layout
    Gliden's Performance
    Performed full project on a quick turnaround timeline over the Christmas break.
    A commercial icon
    Office Renovation

    Client
    D&B Attorneys at Law
    Project Details
    • Assisted with a quick office renovation for an attorney
    • Removed acoustical ceiling tile and replaced with all new ceiling and grid
    • Successfully completed all work for owner in a short time frame under short notice
    HVAC Replacement

    Client
    Richardson ISD - Forest Lane Academy
    Project Details
    • Gliden completed all architectural scope for an HVAC renovation at Forest Lane Academy.
    • Updates included acoustical ceiling and gypsum ceiling replacements throughout the school as well as painting updates in several locations.
    Gliden Performance
    • Gliden worked diligently with trade partners to schedule the project within a short summer timeframe, expediting the startup process and submittals to mobilize for the summer break.
    HVAC Replacement

    Client
    Richardson ISD - Big Springs Elementary School
    Project Details
    • Gliden completed all architectural scope for an HVAC renovation at Big Springs Elementary School.
    • Updates included acoustical ceiling and gypsum ceiling replacements throughout the school at various repair locations.
    Gliden Performance
    • Gliden worked diligently with trade partners to schedule the project within a short summer timeframe, expediting the startup process and submittals to mobilize for the summer break.
    Paving Pourback

    Client
    Southern Methodist University
    Project Details
    • Completed a paving pourback at the SMU Embry Engineering Building following the repair of underground steam piping
    Gliden Performance
    • Requested and performed on a short turnaround to ensure on-time project completion
    Millwork Installations

    Client
    Aledo ISD - Vandagriff Elementary
    Project Details
    • Installed a new millwork cabinet system at Vandagriff Elementary School
    Gliden Performance
    • Completed the project over the summer break to prevent any disruptions to school scheduling
    A commercial icon
    Cooling Efficiency

    Client
    Confidential Client
    Project Details
    • The Cooling Efficiency project included roof patching, waterproofing, and installation of new curbs following the replacement of existing RTU’s to improve the center’s cooling system.
    Gliden Performance
    • Requested and completed on a short timeline for an existing client
    A dismiss icon